Interactive analysis

Models you can touch.

The same numbers behind the research, made adjustable. Estimates for exploration — not engineering.

Interactive model

AI Data Center Power Calculator

Estimate what it actually takes to power an AI data center — from IT load to annual grid impact.

65.0MWTotal facility power
484GWh/yrAnnual energy
$33.9M/yrAnnual energy cost
44,800homesEquivalent households
Facility power = IT load × PUE. Annual energy = facility power × 8,760 h × utilization. Household equivalence assumes ≈10,800 kWh/yr per U.S. home. Estimates for exploration, not engineering.

More interactive models are in development alongside the research. Read the insights →

Back to ENVIZN